MICHIGAN 3 Biogas Plant

Location USA
Construction Period 2024/ 2025
Input manure
Fermenter Steeltank 1 x 7,100 m³
Gas utilization biogas production: 13,000 m³/d; biogas upgrading: 550 m³ Nm³/h biogas, biogas output: 2,9 MW
Extension  
Specials 1 digester, 1 secondary digester, Biological desulphurization and subsequent gas treatment using a membrane separation process. Biomethane purified in this way is fed into the natural gas grid.
Responsibility Basic evaluation, pre-, draft- and executationplaning, tendering, participating in contract awarding process, site management/project controlling, start-up, training for operator