MICHIGAN 3 Biogas Plant
Location | USA |
Construction Period | 2024/ 2025 |
Input | manure |
Fermenter | Steeltank 1 x 7,100 m³ |
Gas utilization | biogas production: 13,000 m³/d; biogas upgrading: 550 m³ Nm³/h biogas, biogas output: 2,9 MW |
Extension | |
Specials | 1 digester, 1 secondary digester, Biological desulphurization and subsequent gas treatment using a membrane separation process. Biomethane purified in this way is fed into the natural gas grid. |
Responsibility | Basic evaluation, pre-, draft- and executationplaning, tendering, participating in contract awarding process, site management/project controlling, start-up, training for operator |