VELEN Biomethan Plant

Location Germany
Construction Period 2023/24
Input Pig and cattle slurry, pig ,cattle, horse, chicken and turkey manure and dry chicken droppings
Fermenter 2 x 9,500 m³ steel tanks, new construction of two fermenters
Gas utilization Gas treatment with pressure swing adsorber (DWA) for an extended biogas plant, 1860 Nm³/h biogas, 945 Nm³/h biomethane, biomethane up to 2,000 Nm³/h is planned
   
Specials 2 secondary digesters, 2 external gas storage tanks, 2 digestate storage tanks, external desulphurisation, separation of digestate
Responsibility Implementation planning, preparation and participation in the award of contracts, construction supervision (site management), commissioning, as well as: Hazard assessment, explosion protection document, operator training
News

News 16.10.2023  Insights into the conversion of two RNG plants projects

News 19.06.2024 Focus on CO2 liquefaction and biomethane production