VELEN Biomethan Plant
Location | Germany |
Construction Period | 2023/24 |
Input | Pig and cattle slurry, pig ,cattle, horse, chicken and turkey manure and dry chicken droppings |
Fermenter | 2 x 9,500 m³ steel tanks, new construction of two fermenters |
Gas utilization | Gas treatment with pressure swing adsorber (DWA) for an extended biogas plant, 1860 Nm³/h biogas, 945 Nm³/h biomethane, biomethane up to 2,000 Nm³/h is planned |
Specials | 2 secondary digesters, 2 external gas storage tanks, 2 digestate storage tanks, external desulphurisation, separation of digestate |
Responsibility | Implementation planning, preparation and participation in the award of contracts, construction supervision (site management), commissioning, as well as: Hazard assessment, explosion protection document, operator training |