HOTTELN Biogas Plant
Location | Germany |
Construction Period | 2006 |
Input | Corn silage |
Fermenter | Concrete tank 2,200 m3, 3,000 m3 |
Gas utilization | Gas engine 536 kWel, 2 x 250 kWel (satellite CHP) |
Extension | 2012: Extension of the biogas plant: Increase of substrate amount by 20,000 t/a; conversion of a storage tank into a digester; construction of a new storage tank with a capacity of 6,000 m³; connection of two external CHP (2 x 250 kWel) |
Specials | Two digester, gas holder above digester and secondary digester, thermophilic operation, heat utilisation in drying facility and in the nearby village |
Responsibility | Basic evaluation, pre-, draft-, approval and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up |
Download Datasheet | Datasheet Hotteln |