POLSKA Biogas Plant
Location | Poland, Breslau |
Construction Period | 2023/2024 |
Input | sugar beet pulp |
Fermenter | Enameled steel tank 4 x 8,930 m³ |
Gas utilization | Biogas production: 8,568 Nm³/h in the sugar beet campaign, 345 Nm³/h outside the campaign Biomethane feed-in: up to 800 Nm³/h, as well as CHP up to 631 Nm³/h. Gas utilization in the biogas boiler Total 45 MW |
Extension | |
Specials | 4 digesters tanks, 2 secondary diagesters tanks, biogas upgrading plant, digestate treatment, external gas storage |
Responsibility | Basic evaluation, preeengineering and part of the detail engineering, site management, start-up |