POLSKA Biogas Plant

Location Poland, Breslau
Construction Period 2023/2024
Input sugar beet pulp
Fermenter Enameled steel tank 4 x 8,930 m³
Gas utilization

Biogas production: 8,568 Nm³/h in the sugar beet campaign, 345 Nm³/h outside the campaign

Biomethane feed-in: up to 800 Nm³/h, as well as CHP up to 631 Nm³/h. Gas utilization in the biogas boiler

Total 45 MW

Extension  
Specials 4 digesters tanks, 2 secondary diagesters tanks, biogas upgrading plant, digestate treatment, external gas storage 
Responsibility Basic evaluation, preeengineering and part of the detail engineering,  site management, start-up