SCHAEFER Biogas Plant

LocationGermany
Construction Period1995
InputManure, straw, other organic waste
FermenterConcrete tank, 500 m3
Gas utilizationDual fuel co-generator, 35 kWel
SpecialsDigester, fed batch system
ResponsibilityBasic evaluation, pre-, draft- and approval planning, advisor for construction