SCHAEFER Biogas Plant
Location | Germany |
Construction Period | 1995 |
Input | Manure, straw, other organic waste |
Fermenter | Concrete tank, 500 m3 |
Gas utilization | Dual fuel co-generator, 35 kWel |
Specials | Digester, fed batch system |
Responsibility | Basic evaluation, pre-, draft- and approval planning, advisor for construction |