BOECKERMANN Biogas Plant

LocationGermany
Construction Period2001/ 2002
InputManure, corn silage, grass silage, dung
FermenterGlass coated steel tank, 2,500 m3
Gas utilizationDual fuel co-generator 2 x 160 kWel
Extension

2013: Residue storage tank (5,000 m3)
2014: Biogas upgrading system (700 Nm³/h bio methane) for both conected biogas plants Böckermann I and II

SpecialsDigester, secondary digester with gas holder roof, heat utilisation in the pig stables
ResponsibilityBasic evaluation, pre-, draft-, approval and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, operation
Download Datasheet101Boeckermanenglisch040222.pdf