MC DONNELL Biogas Plant

LocationIreland
Construction Period2009
InputKitchen waste, cattle manure, poultry dung, animal By-Products (ABP), corn silage
FermenterSteel tank 1,300 m3
Gas utilizationGas engine 250 kWel
Extension2014: Extension of the existing biogas plant by one digester, a second pumproom, including piping and heating technology
SpecialsOne digester, one secondary digester, gas holder above digester and secondary digester, mesophilic operation, pasteurisation, separation of digestate
ResponsibilityBasic evaluation, pre-, draft- and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, training for operators