ZIPPERER Biogas Plant
Location | Germany |
Construction Period | 1990 |
Input | Manure, straw |
Fermenter | Steel tanks, 2 x 60 m3 each |
Gas utilization | Gas engine, 15 kWel |
Specials | Two digester, gas holder above 400 m³ storage tank, solid/liquid separation |
Responsibility | Basic evaluation, pre-, draft- and execution planning, site management/project controlling, start-up |