RoRo-ENERGIE Biogas Plant
Location | Germany |
Construction Period | 1996 -1998 |
Input | Biowaste (separately collected in households), residues from breweries |
Fermenter | Concrete tank, 400 m3 |
Gas utilization | Two dual fuel co-generators, 95 kWel each |
Specials | Pretreatment for all input substrates, conditioning, pasteurisation, one central located digester, storage tank, other digester decentralized |
Responsibility | Basic evaluation, pre-, draft-, approval and execution planning (for TBW GmbH) |