BARZ Biogas Plant

LocationGermany
Construction Period1996-1998
InputManure, kitchen waste
FermenterTwo-stage-concrete tank, 20 m3 and 230 m3
Gas utilizationDual fuel co-generator, 45 kWel
SpecialsTwo digester with gas holder roof, manure storage tank, hygienisation
ResponsibilityBasic evaluation, pre-, draft-, approval and execution planning, site management/project controlling, start-up (for TBW GmbH)