Activities Argentina

2022
  1. Support engineering work, review of technical drawings, heat balance; support start-up concept of a biogas plant in Argentinia
  2. Consulting work for the start-up of a Biogas plant in Argentinia
2020
  1. Support engineering work, technical drawings, heat balance, support ordering; support start-up concept of a biogas plant in Argentinia
  2. Consulting work for the start-up of the Biogas plant in Argentinia
  3. Check for construction deficiencies, Support of Start-up in Argentinia
2019
  1. Inspection of a P&ID diagramm in Argentinia
  2. Preplanning of the extensions of a biogas plant in Argentinia
  3. Operator service for a biogas plant in Argentinia, (module13/ technical guideline for the handling of hazardous materials 529) and change system operation from corn silage to thin stillage
2018
  1. Preplanning of a biogas plant in Argentinia
2017
  1. Extension of an existing biogas plant in Argentina by a new second digester and a further CHP plant
  2. Operator service for a biogas plant in Argentina
2016
  1. Study on the digestability of thin stillage in Argentina
  2. Basic evaluation, pre-, draft- and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up of a biogas plant in Argentina
  3. Extension of an existing biogas plant in Argentina
2013
  1. Complete engineering of an agricultural biogas plant in Argentina; concept, detailed and final design, cost assessment, calls for tenders, supervision and start up.