SCHULTES Biogas Plant
Location | Germany |
Construction Period | 1994 |
Input | Manure, other organic waste |
Fermenter | Concrete tank, 200 m3 |
Gas utilization | Dual fuel co-generator, 45 kWel |
Specials | Digester Freese system, gas holder above 1.500m3-manure storage tank |
Responsibility | Basic evaluation, pre-, draft-, approval and execution planning, site management/project controlling, assembly of mixer and gas holder, start-up (for TBW GmbH) |