SCHULTES Biogas Plant

LocationGermany
Construction Period1994
InputManure, other organic waste
FermenterConcrete tank, 200 m3
Gas utilizationDual fuel co-generator, 45 kWel
SpecialsDigester Freese system, gas holder above 1.500m3-manure storage tank
ResponsibilityBasic evaluation, pre-, draft-, approval and execution planning, site management/project controlling, assembly of mixer and gas holder, start-up (for TBW GmbH)