JCBE DERBY Biogas Plant

Location UK, Derby
Construction Period 2017/2018
Input Hydrolised Kitchen Cat. 2 (viscera)-, paper and cardboard waste (treated by TPH), water (recycled, rain, mains)
Fermenter Concrete tank, 2 x 5,300 m³
Gas utilization Gas-upgrading system, injection into the national grid
Specials Pretreament system: Thermal Pressure Hydrolysis (TPH) for input material, cooling tank with central agitator for reception of hot input material, substrate cooling system, two storage tanks, two digester and one secondary digester - all equipped with double membrane gas holder roof, biogas upgrading system
Responsibility Basic evaluation, pre-, draft- and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, operator training and instruction